When does Icynene usually get installed? | Icynene

Languages

international distributors

Find A Local Contractor
 
 

When does Icynene usually get installed?

You are here

  • You are here:
  • Home / When does Icynene usually get installed?

Icynene spray foam usually gets installed just before drywall installation. Everything including the framing, windows, doors and electrical, plumbing inspections should be completed prior to the installation of Icynene spray foam. Typically, following the application of Icynene, the installation of 0.5-inch dry wall will provide the thermal barrier cover when required by the codes. It is best to always refer to your local code requirements and speak to an Icynene representative to ensure that you are meeting the requirements in your local area.

Leave a Reply

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd><i>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.